img
No Internet
SWIPE TO GO BACK
TRIP
POSITION
INFO
PORT CALLS
VISITED PORTS
LAST TRIPS
EVENTS
WEATHER
Upload Photo
Type
IMO ---
MMSI 368437760
Flag
Flag USA
Call Sign WDQ5787
Size 511 x 63 m
GT ---
DWT ---
Build ---
Status Active
Owner

Current Trip

Flag USFLL
ATD
2025-12-21 18:38 (LT)
Flag USFLL
ATA
2025-12-21 20:34 (LT)
1 day ago
Trip Time 1 h, 56 mins
Trip Distance 10.97 nm
AVG Speed 5.8 Knots
MAX Speed 8 Knots
Draught ---
AVG Wind 12.8 knots
MAX Wind 14.3 knots
MIN Temp 24.6°C / 76.28°F
MAX Temp 24.9°C / 76.82°F
Position Received 1 m ago

Current Position

Longitude -80.12453°
Latitude 26.10753°
Status Default
Speed
Course 85°
Area North Atlantic Ocean
Station T-AIS
Position Received 1 m ago

Info

info

Information

The current position of CRITICAL PATH is in North Atlantic Ocean with coordinates 26.10753° / -80.12453° as reported on 2025-12-23 15:10 by AIS to our vessel tracker app. The vessel's current speed is 0 Knots and is currently inside the port of FORT LAUDERDALE.

The vessel CRITICAL PATH (MMSI: 368437760) is a Pleasure Craft It's sailing under the flag of [US] USA.

In this page you can find informations about the vessels current position, last detected port calls, and current voyage information. If the vessels is not in coverage by AIS you will find the latest position.

The current position of CRITICAL PATH is detected by our AIS receivers and we are not responsible for the reliability of the data. The last position was recorded while the vessel was in Coverage by the Ais receivers of our vessel tracking app.

Weather

Temperature 24°C / 75.2°F
Wind Speed 21 knots
Direction 69° ENE
Pressure 1025.9 hPa
Humidity 71.4 %
Cloud Coverage 84 %

Featured Company

Last Port Calls

Port Arrival Departure Time In Port
Flag FORT LAUDERDALE 2025-12-21 20:34
Flag FORT LAUDERDALE 2025-11-25 14:34 2025-12-21 18:38 26 d
Flag FORT LAUDERDALE 2025-11-23 15:32 2025-11-25 07:45 1 d
Flag FORT LAUDERDALE 2025-11-14 14:31 2025-11-21 09:07 6 d
Flag FORT LAUDERDALE 2025-11-13 20:12 2025-11-14 06:43 10 h
Flag FORT LAUDERDALE 2025-11-13 18:50 2025-11-13 20:02 1 h
Flag FORT LAUDERDALE 2025-11-06 11:38 2025-11-13 18:36 7 d
Flag FORT LAUDERDALE 2025-11-02 14:20 2025-11-06 10:06 3 d
Flag FORT LAUDERDALE 2025-11-02 08:00
Show More

Most Visited Ports (Last year)

Port Arrivals
Flag FORT LAUDERDALE 8

Last Trips

Origin Departure Destination Arrival Distance
Flag FORT LAUDERDALE 2025-12-21 18:38 Flag FORT LAUDERDALE 2025-12-21 20:34 10.97 nm
Flag FORT LAUDERDALE 2025-11-25 07:45 Flag FORT LAUDERDALE 2025-11-25 14:34 33.05 nm
Flag FORT LAUDERDALE 2025-11-21 09:07 Flag FORT LAUDERDALE 2025-11-23 15:32 12.49 nm
Flag FORT LAUDERDALE 2025-11-14 06:43 Flag FORT LAUDERDALE 2025-11-14 14:31 7.15 nm
Flag FORT LAUDERDALE 2025-11-13 20:02 Flag FORT LAUDERDALE 2025-11-13 20:12 1.22 nm
Flag FORT LAUDERDALE 2025-11-13 18:36 Flag FORT LAUDERDALE 2025-11-13 18:50 1.43 nm
Flag FORT LAUDERDALE 2025-11-06 10:06 Flag FORT LAUDERDALE 2025-11-06 11:38 9.55 nm
Flag FORT LAUDERDALE 2025-11-02 08:00 Flag FORT LAUDERDALE 2025-11-02 14:20 4.53 nm

Events

Time Event Details Position / Dest Info
2025-12-22 01:38 STOP Moving Flag FORT LAUDERDALE
26.10749 / -80.12456
[US] FORT LAUDERDALE
Speed: 0.2 kn
Course: 80°
2025-12-22 01:34 PORT ARRIVAL Flag FORT LAUDERDALE
26.10771 / -80.12284
[US] FORT LAUDERDALE
Speed: 4.7 kn
Course: 299°
2025-12-22 00:35 START Moving 4.31 nm, North of FORT LAUDERDALE
26.19010 / -80.10284
Speed: 5.3 kn
Course: 181.5°
2025-12-22 00:25 STOP Moving 4.57 nm, North of FORT LAUDERDALE
26.19459 / -80.10260
Speed: 0.2 kn
Course: 173°
2025-12-21 23:38 PORT DEPARTURE Flag FORT LAUDERDALE
26.14281 / -80.10729
Speed: 6.6 kn
Course: 9°
2025-12-21 23:19 START Moving Flag FORT LAUDERDALE
26.12245 / -80.10878
[US] FORT LAUDERDALE
Speed: 6.2 kn
Course: 9°
2025-12-21 23:02 STOP Moving Flag FORT LAUDERDALE
26.11861 / -80.10928
[US] FORT LAUDERDALE
Speed: 0.2 kn
Course: 5°
2025-12-21 22:48 START Moving Flag FORT LAUDERDALE
26.10651 / -80.12094
[US] FORT LAUDERDALE
Speed: 5.3 kn
Course: 107°
2025-12-18 20:06 IN Coverage
26.10752 / -80.12455
North Atlantic Ocean
[US] FORT LAUDERDALE
Speed:
Course: 33.2°
Show More