img
No Internet
SWIPE TO GO BACK
TRIP
POSITION
INFO
PORT CALLS
VISITED PORTS
LAST TRIPS
EVENTS
WEATHER
Upload Photo
Type
IMO ---
MMSI 368437760
Vlag
Flag USA
Call Sign WDQ5787
Grote 21 x 5 M
GT ---
DWT ---
Bouw ---
Status Active
Eigenaar

Current Trip

Flag USFLL
ATD
2025-12-27 19:07 (LT)
Flag USFLL
ATA
2025-12-27 19:56 (LT)
8 days ago
Trip Time 49 mins
Trip Distance 2.78 nm
AVG Speed 5 Knopen
MAX Speed 6.1 Knopen
Diepgang ---
AVG Wind 5 knots
MAX Wind 5 knots
MIN Temp 23.1°C / 73.58°F
MAX Temp 23.2°C / 73.76°F
Positie ontvangen 1 h, 10 m geleden

Current Position

Lengtegraad -80.12459°
Breedtegraat 26.10752°
Status Default
Snelheid
Koers 86°
Gebied North Atlantic Ocean
Station T-AIS
Positie ontvangen 1 h, 10 m geleden

Info

info

Information

The current position of CRITICAL PATH is in North Atlantic Ocean with coordinates 26.10752° / -80.12459° as reported on 2026-01-05 03:37 by AIS to our vessel tracker app. The vessel's current speed is 0 Knopen and is currently inside the port of FORT LAUDERDALE.

The vessel CRITICAL PATH (MMSI: 368437760) is a Pleasure Craft It's sailing under the flag of [US] USA.

In this page you can find informations about the vessels current position, last detected port calls, and current voyage information. If the vessels is not in coverage by AIS you will find the latest position.

The current position of CRITICAL PATH is detected by our AIS receivers and we are not responsible for the reliability of the data. The last position was recorded while the vessel was in Coverage by the Ais receivers of our vessel tracking app.

Weather

Temperature 23.2°C / 73.76°F
Wind Speed 11 knots
Direction 53° NE
Pressure 1017.6 hPa
Humidity 68.3 %
Cloud Coverage ---

Featured Company

Last Port Calls

Port Arrival Departure Time In Port
Flag FORT LAUDERDALE 2025-12-27 19:56
Flag FORT LAUDERDALE 2025-12-21 20:34 2025-12-27 19:07 5 d
Flag FORT LAUDERDALE 2025-11-25 14:34 2025-12-21 18:38 26 d
Flag FORT LAUDERDALE 2025-11-23 15:32 2025-11-25 07:45 1 d
Flag FORT LAUDERDALE 2025-11-14 14:31 2025-11-21 09:07 6 d
Flag FORT LAUDERDALE 2025-11-13 20:12 2025-11-14 06:43 10 h
Flag FORT LAUDERDALE 2025-11-13 18:50 2025-11-13 20:02 1 h
Flag FORT LAUDERDALE 2025-11-06 11:38 2025-11-13 18:36 7 d
Flag FORT LAUDERDALE 2025-11-02 14:20 2025-11-06 10:06 3 d
Flag FORT LAUDERDALE 2025-11-02 08:00
Show More

Most Visited Ports (Last year)

Port Arrivals
Flag FORT LAUDERDALE 9

Last Trips

Origin Departure Destination Arrival Distance
Flag FORT LAUDERDALE 2025-12-27 19:07 Flag FORT LAUDERDALE 2025-12-27 19:56 2.78 nm
Flag FORT LAUDERDALE 2025-12-21 18:38 Flag FORT LAUDERDALE 2025-12-21 20:34 10.97 nm
Flag FORT LAUDERDALE 2025-11-25 07:45 Flag FORT LAUDERDALE 2025-11-25 14:34 33.05 nm
Flag FORT LAUDERDALE 2025-11-21 09:07 Flag FORT LAUDERDALE 2025-11-23 15:32 12.49 nm
Flag FORT LAUDERDALE 2025-11-14 06:43 Flag FORT LAUDERDALE 2025-11-14 14:31 7.15 nm
Flag FORT LAUDERDALE 2025-11-13 20:02 Flag FORT LAUDERDALE 2025-11-13 20:12 1.22 nm
Flag FORT LAUDERDALE 2025-11-13 18:36 Flag FORT LAUDERDALE 2025-11-13 18:50 1.43 nm
Flag FORT LAUDERDALE 2025-11-06 10:06 Flag FORT LAUDERDALE 2025-11-06 11:38 9.55 nm
Flag FORT LAUDERDALE 2025-11-02 08:00 Flag FORT LAUDERDALE 2025-11-02 14:20 4.53 nm

Events

Tijd Evenement Details Positie / Bestemming Info
2026-01-05 03:37 Buitenbereik
26.10752 / -80.12459
North Atlantic Ocean
[US] FORT LAUDERDALE
Snelheid:
Koers: 86°
2026-01-05 02:06 Binnenbereik
26.10752 / -80.12452
North Atlantic Ocean
[US] FORT LAUDERDALE
Snelheid:
Koers: 87°
2026-01-05 00:48 Buitenbereik
26.10753 / -80.12454
North Atlantic Ocean
[US] FORT LAUDERDALE
Snelheid:
Koers: 86°
2026-01-05 00:27 Binnenbereik
26.10752 / -80.12459
North Atlantic Ocean
[US] FORT LAUDERDALE
Snelheid:
Koers: 87°
2026-01-04 22:33 Buitenbereik
26.10751 / -80.12457
North Atlantic Ocean
[US] FORT LAUDERDALE
Snelheid:
Koers: 88°
2026-01-04 22:33 Binnenbereik
26.10751 / -80.12457
North Atlantic Ocean
[US] FORT LAUDERDALE
Snelheid:
Koers: 88°
2026-01-04 21:09 Buitenbereik
26.10750 / -80.12457
North Atlantic Ocean
[US] FORT LAUDERDALE
Snelheid:
Koers: 86°
2026-01-04 20:31 Binnenbereik
26.10750 / -80.12457
North Atlantic Ocean
[US] FORT LAUDERDALE
Snelheid:
Koers: 87°
2026-01-04 18:39 Buitenbereik
26.10752 / -80.12459
North Atlantic Ocean
[US] FORT LAUDERDALE
Snelheid:
Koers: 87°
2026-01-04 17:33 Binnenbereik
26.10751 / -80.12457
North Atlantic Ocean
[US] FORT LAUDERDALE
Snelheid:
Koers: 87°
Show More